I am going to install 144' header of 10"SDR 9 and going to be abouht 6" of the ground, my question is what is the best support to install and how far apart thk you


Top
 Profile  
 
 Post subject:
PostPosted: August 16th, 2006, 3:56 pm 
Offline
Fusion Expert
User avatar

Joined: August 16th, 2006, 3:39 pm
Posts: 13
There are several variables to consider when designing supports for PE. Temperature and type of product contained in the pipeline, all play a factor in how far apart spacing should be. Supports should cradle 120 deg. of the bottom of the pipe and they should be at least 5 1/2" wide, with all edges rounded. For 10" DR9 filled with water at 73 deg ambient, spacing should be 10.9 ft. If you are transporting product other than water, and have higher operating temperatures, I suggest you go to www.driscoplex.com then the applications section. In the serch area type in FIELD HANDBOOK their handbook will come up. Pages 42-46 will give you the formulas and steps to figure support spacing for any application you might have. Hope this helps you.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group